1. First of all, the base wall of the polyurethane sandwich panel should meet the requirements of the specification, and has been checked and accepted.

2. The construction of the polyurethane sandwich panel machine should be carried out after the base layer is painted with cement mortar leveling layer and the construction quality is qualified.

3. Before the construction of the thermal insulation project, the opening of the outer door and window should pass the acceptance. The size and position of the opening should also meet the design requirements and pass the acceptance. Moreover, the door and window frames or auxiliary frames should be installed and waterproofed while the pre-embedded parts and connectors of fire ladders, downpipes, various entry pipelines and air conditioners that extend out of the wall should be installed. What's more, the thickness of the polyurethane sandwich panel should be reserved.

4. The external wall scaffolding which should be stable and reliable for the installation of insulation boards is required.

5. The ambient temperature during construction should not be higher than 35℃, or lower than 5℃, and should not be lower than 0℃ within 24h. The wind should not be higher than level 5. Moreover, the rainproof measures should be taken during construction in rainy days.

6. The incoming materials of polyurethane sandwich panels should be stored in a dry and cool place. The storage period and conditions should be in accordance with the requirements of the material supplier's product description.


The above is the construction requirements for polyurethane sandwich panels brought to you today. We, Zhejiang Jinggong Science & Technology Co., Ltd., are engaged in polyurethane sandwich panel production line and have unique insights on the process in this area. Welcome to consult.

Related Jinggong Machines
  • Sandwich Panel LineSandwich Panel Line2020/08/03JINGGONG sandwich panel line consists of decoiling system, a cutting & filming system, roll forming machine, preheating system, rockwool system, PU foaming system, double belts system, band-saw cutting system, cooling system, auto-stacking, packing and electrical control system, etc., in our continuous PU/PIR/Rockwool sandwich panel equipment.
  • PU / PIR Continuous Sandwich Panel Production LinePU / PIR Continuous Sandwich Panel Production Line2020/08/03The product of PU / PIR Continuous Sandwich Panel Machine is a new type building material, which has the function such as good flame retarding, keep warm, heat insulation, sound insulation, waterproof, handiness, environmental protection and so on.
  • Rockwool Continuous Sandwich Panel Production LineRockwool Continuous Sandwich Panel Production Line2020/08/03The laminating system of Rockwool sandwich panel machine consists of feeding, glue, heating, laminating and post-cutting. The whole machine is under the control of PLC. The line can produce single corrugated sheet, and can also produce the sandwich panel with rabbet joint and corrugated sandwich panel.
Related Video
Related News
Any Questions About Jinggong Building Materials Machinery?
Email us with inquiries or use our contact data.
GET IN TOUCH